Podcast: What goes into making America’s first electric tug?

Marine Log Listen Up Podcast
In this edition of Listen Up!, join Marine Log’s editor in chief, Heather Ervin, as ABB Marine & Ports’ David Lee and Crowley’s Coulston “Cole” Van Gundy, director-commercial operations, discuss the 82-foot eWolf tug that will operate at the Port of San Diego’s Tenth Avenue Marine Terminal by mid-2023.
Hear what they had to say > 

PODCAST: Crowley and ABB on first U.S. E-tug
PodcastHeadshot1
The tug, the first-ever fully electric tug to be built or operate in the United States, will be constructed at the Master Boat Builders shipyard in Coden, Ala., with the design and on-site construction management being provided by Crowley Engineering Services and its recently integrated Jensen Maritime naval architecture and marine engineering group.
Listen to the podcast >